Prefabrication/VDC

Prefabbed Hospital Head Walls

1.09.19

Jon (‘Don’t call me John’) Heaner led the head wall build in the shop for PVMC with help from Erik Gronberg and Mike Fletcher.  After we completed the prototype, we were able to complete 28 walls in just 2 weeks! This is the first time we have done this type of project in the shop. Great job, everyone!

The PVMC 3rd floor project(Platte Valley Medical Center) is with GH Phipps (GC) led by Jonathan Bauer PM – and Jason Kizer FS.